Logo

14 日 マニラ

32°C25°C
両替レート
¥10,000=P3,800
$100=P5,800

14 日 マニラ

32°C25°C
両替レート
¥10,000=P3,800
$100=P5,800

Daily PNR trips from Alabang to Calamba temporarily suspended starting July 2

2023/6/3 英字

In a bid to give way for the construction of the North-South Commuter Railway (NSCR), daily trips of the Philippine National Railways’ (PNR) Alabang to Calamba route will be temporarily suspended starting Friday, June 2.

Only two trips will be affected by the route’s closure?the 4:38 am trip and 7:56 pm trip. About 467 commuters take each trip daily.

According to Transportation Undersecretary for Railways Cesar Chavez, an elevated, double-track and electrified train system will be built directly above the existing PNR tracks, speeding up the construction of the NSCR by eight months.

The new NSCR system will replace the PNR’s present street level, single track and diesel locomotive set-up.

While the NSCR is being constructed along the route, the following PNR stations will be temporarily unavailable: Alabang, Muntinlupa, San Pedro, Binan, Sta. Rosa, Cabuyao, Mamatid, and Calamba.

Once completed, the 147-km NSCR will cut travel time from Clark Airport in Pampanga to Calamba in Laguna to less than two hours, from 4-4.5 hours. It is set to accommodate 800,000 passengers a day. During its construction, approximately 110,000 direct and indirect jobs are expected to be generated. DOTr

おすすめ記事

50% want Duterte to be held accountable for war on drugs: SWS

2025/10/14 英字 無料
無料

Marcos orders modular shelter units for earthquake-hit areas

2025/10/14 英字 無料
無料

PCG official denies China claim it expelled Philippine ships near Pag-Asa Island

2025/10/14 英字 無料
無料

House approves P6.793 trillion budget for 2026 on third and final reading

2025/10/14 英字 無料
無料

ICI eyes filing 15 cases before Ombudsman against person involved in anomalous flood control projects

2025/10/14 英字 無料
無料

DOH says influenza-like cases yet to peak

2025/10/14 英字 無料
無料