Logo

13 日 マニラ

33°C24°C
両替レート
¥10,000=P3,850
$100=P5,720

13 日 マニラ

33°C24°C
両替レート
¥10,000=P3,850
$100=P5,720

Daily PNR trips from Alabang to Calamba temporarily suspended starting July 2

2023/6/3 英字

In a bid to give way for the construction of the North-South Commuter Railway (NSCR), daily trips of the Philippine National Railways’ (PNR) Alabang to Calamba route will be temporarily suspended starting Friday, June 2.

Only two trips will be affected by the route’s closure?the 4:38 am trip and 7:56 pm trip. About 467 commuters take each trip daily.

According to Transportation Undersecretary for Railways Cesar Chavez, an elevated, double-track and electrified train system will be built directly above the existing PNR tracks, speeding up the construction of the NSCR by eight months.

The new NSCR system will replace the PNR’s present street level, single track and diesel locomotive set-up.

While the NSCR is being constructed along the route, the following PNR stations will be temporarily unavailable: Alabang, Muntinlupa, San Pedro, Binan, Sta. Rosa, Cabuyao, Mamatid, and Calamba.

Once completed, the 147-km NSCR will cut travel time from Clark Airport in Pampanga to Calamba in Laguna to less than two hours, from 4-4.5 hours. It is set to accommodate 800,000 passengers a day. During its construction, approximately 110,000 direct and indirect jobs are expected to be generated. DOTr

おすすめ記事

No violation of sovereignty with Duterte's arrest: Marcos

2025/3/13 英字 無料
無料

Human rights groups. victims families say Duterte arrest crucial steps towards justice

2025/3/13 英字 無料
無料

Duterte set to arrive in the Netherlands Thursday morning

2025/3/13 英字 無料
無料

SC did not release TRO on petition of Duterte and dela Rosa

2025/3/13 英字 無料
無料

No bail for Duterte seen, says law professor

2025/3/13 英字 無料
無料

PNP goes on heightened alert nationwide

2025/3/13 英字 無料
無料